skyWATS.com Availability - User Level: | Manager |
The Unit Verification Rules is used in the “Total process yield” report and “Unit Verification” report (Operator Interface).
E.g. The “Unit Verification” report will check if a scanned unit has completed and PASSED all Test Operation specified.
The “Total process yield” will use the Test Operation (Process) with highest Index to calculate Yield.
See Also:
Unit Verification report
Total process yield
Product Groups
Processes
Unit Verification Rules can be specified for a Product Group, Part Number or Part Number and Revision, then select one or several Test Operations applicable for the selection.
Registered product operations are displayed in a table. Both Part Number and Revision may contain wildcard characters.
Comments
1 comment
Help file states
Process Index: Priority number
What does this mean and what does it do ?
Please sign in to leave a comment.